Explore traces in Discover

Important

Except for the investigation flyouts, the functionality described on this page is in technical preview. It might change or be removed at any time.

Discover offers a dedicated experience for exploring trace data. When Discover detects data in traces-* indices, it automatically enables features that help you investigate distributed traces more effectively. The traces experience includes a preselected set of trace fields in the data grid, a structured overview of each document's key attributes, latency comparisons for similar spans, and a waterfall visualization of the full trace timeline.

If you're getting started with Discover and want to learn its main principles, get familiar with the default experience.

Discover showing trace data with the traces profile active, including preselected columns for service name, transaction name, span name, and duration.

Data stored in traces-* indices is automatically recognized as trace data and triggers the Discover experience described on this page.

Viewing trace data in Discover requires at least read privileges for Discover.

For more information, refer to Kibana privileges.

The traces experience is available in:

  • Data view mode: Select a data view that matches a traces-* index pattern from the Discover main page.

  • ES|QL mode: Switch to ES|QL mode and use the FROM command to query your trace data:

    FROM traces-*
    		

    You can also query a specific index:

    FROM traces-apm-default
    		

When Discover recognizes trace data, it preselects a set of relevant fields as columns in the data grid: service.name, transaction.name, span.name, transaction.duration.us, span.duration.us, and event.outcome. You can reorder, resize, or add new columns using the standard Discover column controls.

In ES|QL mode, Discover displays three summary charts above the results:

  • Latency: Average response time over the selected time range
  • Error Rate: Percentage of failed trace events over time
  • Throughput: Number of trace events per unit of time
ES|QL mode showing Latency, Error Rate, and Throughput summary charts above the trace results.

Select in any row to open the document detail panel. The Overview tab shows the key attributes of the selected trace document:

  • Span ID and Span name: Identifies the specific operation
  • Trace ID: Links all documents that belong to the same trace
  • Service name: The service that generated this span
  • Duration: How long the operation took, and what percentage of the total trace duration it represents
  • Start time: When the operation started
  • Type and Subtype: The category of the operation, for example db / postgresql or external / http
The Overview tab in the document detail panel showing span attributes including Trace ID, Service name, Duration as a percentage of trace, and a latency chart in the Similar spans section.

Investigate a service, transaction, trace, and individual span or error in a series of flyouts without leaving Discover.

Before you begin:

  • Take into consideration that opening a service flyout requires access to APM.
  • You need to Load trace data in Discover.
  1. Click View details in a transaction or span's row to open the document detail panel.
  2. On the document's Overview tab, click the Service name value (service.name). The service flyout opens with the service's key metrics.
  3. On the service flyout's Overview tab, scroll to Transactions and click a transaction name. The transaction flyout shows its metrics, latency distribution, and trace samples.
  4. In the transaction flyout, under Trace sample, click a span or transaction in the timeline to open the full trace waterfall. You can also use View full trace when the button is available.
  5. Click a span or transaction in the full trace waterfall to inspect its document. If it has associated errors, click View error or View n errors in its waterfall row.

Use Back to return to the previous flyout.

Services with unprocessed OpenTelemetry data show key metrics but don't have a Transactions table, so the transaction drill-down is unavailable. You can still inspect their spans through the document's expanded trace timeline.

The service flyout opens with the document's environment and the time range selected in Discover. It doesn't inherit the Discover query or filter pills.

The transaction flyout follows changes to the service flyout's Environment, Transaction type, and time range.

If a change excludes the selected transaction, the transaction flyout keeps showing the previous data and displays a warning. Check Environment, Transaction type, and Date range in the transaction summary to see which filters apply. When the transaction matches again, the flyout resumes using the service flyout's filters.

The Similar spans section shows a latency chart for spans with the same type and name across your data. Use this view to compare the selected span's performance against historical samples and identify outliers.

The Similar spans section in the document detail panel showing a latency chart for spans with the same type and name, with an Open in Discover link.

Select Open in Discover to open a filtered view of all similar spans.

The Trace summary section shows a condensed waterfall of the trace the selected document belongs to. Each row represents a span or transaction, positioned on a timeline to show when it started and how long it took.

Select Expand trace timeline to open the expanded waterfall view.

The expanded trace timeline shows all spans and transactions in a trace in a dedicated flyout waterfall view. A color-coded legend identifies which service each span belongs to. Failed spans are highlighted to help you quickly locate errors.

Tip

Turn on Show critical path to highlight the sequence of spans that determined the trace's total duration.

The Logs section shows log entries correlated with the selected trace. Select Open in Discover to explore those logs in context.

Use the GenAI tab to inspect model calls, token usage, and recorded prompts and responses. These views use the gen_ai.* attributes defined by the OpenTelemetry GenAI semantic conventions. They work with Elastic OpenTelemetry and other OpenTelemetry instrumentations that record these attributes. For setup instructions, refer to LLM observability with Elastic OpenTelemetry.

To open the tab:

  1. Load trace data in Discover and select a time range that includes your application's model calls.
  2. In the results table, click View details for a span or transaction that contains GenAI attributes.
  3. Select GenAI, next to Overview, in the document detail panel. The tab appears only when the selected document contains GenAI attributes with values.

The Details section shows the attributes recorded for the selected operation. Each row appears only when the span carries a value for its attribute, so the fields you see vary by instrumentation and provider:

Field Description
Operation The operation performed, such as chat, from gen_ai.operation.name.
Request model The model requested by the application, from gen_ai.request.model.
Provider The provider from gen_ai.provider.name, or gen_ai.system for instrumentation that uses the older attribute.
Input tokens The input token count recorded in gen_ai.usage.input_tokens.
Output tokens The output token count recorded in gen_ai.usage.output_tokens.
Response model The model that produced the response, from gen_ai.response.model.
Conversation ID The identifier that groups related model calls, from gen_ai.conversation.id.
Response ID The identifier the provider assigned to the response, from gen_ai.response.id.
Finish reasons Why the model stopped generating, such as stop or length, from gen_ai.response.finish_reasons.
temperature, top_p, top_k, max_tokens, seed The request parameters sent to the model, from the matching gen_ai.request.* attributes. These rows keep their semantic convention names.

In Discover, hover over a field value to use Filter for value or Filter out value . Hover over a field name to use Filter for field present or Toggle column in table. These actions help you find related model calls or compare their attributes in the results table. Available actions depend on the field and query mode.

When the instrumentation records message content, the Conversation section shows prompts and responses with their roles, such as user or assistant. Click Copy message next to a message to copy its full contents.

The conversation is built from the gen_ai.input.messages and gen_ai.output.messages attributes, added in version 1.37.0 of the OpenTelemetry semantic conventions. For instrumentation that records gen_ai.prompt and gen_ai.completion instead, Kibana falls back to those attributes. Instrumentation that predates version 1.37.0 records messages as separate events, which the GenAI tab doesn't show.

Messages and token counts are recorded separately. A span can include token usage without message content. For message capture settings, refer to the documentation for your instrumentation.

Message values longer than 1,024 characters aren't indexed, so Kibana reads them from the document source, matching the span by _id or, when that isn't available, by span.id. A Content may be incomplete message appears only when a query returns neither field, such as an ES|QL query that uses KEEP without span.id. To resolve it, add span.id to the query, or add METADATA _id, _index to the FROM command.

You can also inspect GenAI spans in a trace waterfall to see model calls alongside the other operations in a request.