MongoDB Atlas Integration

Version 1.3.1 (View all)
Managed integration release status
Subscription level
What's this?
Basic
Developed by
What's this?
Elastic
Ingestion method(s) API
Minimum Kibana version(s) 9.0.0
8.13.0
Important - Managed integrations on Elastic Cloud Hosted

You can use this integration as an Elastic Managed integration on Elastic Cloud Hosted deployments running this version or later.

MongoDB Atlas, the leading multi-cloud developer data platform, offers the easiest way to run MongoDB, enabling you to work with your code's objects directly through its document-based data model, which allows for flexible schema and easy scalability.

Use the MongoDB Atlas integration to:

  • Collect MongoDB Atlas alert, mongod audit, mongod database, organization, and project logs, along with disk, hardware and process metrics for comprehensive monitoring and analysis.
  • Create informative visualizations to track usage trends, measure key metrics, and derive actionable business insights.
  • Set up alerts to minimize Mean Time to Detect (MTTD) and Mean Time to Resolve (MTTR) by quickly referencing relevant logs during troubleshooting.

The MongoDB Atlas integration collects logs and metrics.

Logs help you keep a record of events that happen on your machine. The Log data stream collected by MongoDB Atlas integration are alert, mongod_audit, mongod_database, organization, and project.

Metrics give you insight into the statistics of the MongoDB Atlas. The Metric data stream collected by the MongoDB Atlas integration are disk, hardware, and process so that the user can monitor and troubleshoot the performance of the MongoDB Atlas instance.

Data streams:

  • alert: Collects alerts generated by MongoDB Atlas instance. Alerts cover a wide range of metrics and events, such as resource utilization thresholds (CPU, memory, disk space), database operations, security issues, and configuration changes.
  • disk: Collects disk or partition metrics for all the hosts in the specified group. Metrics like measurements for the disk, such as I/O operations, read and write latency, and space usage.
  • hardware: Collects all the Atlas search hardware and status data series within the provided time range for one process in the specified project.
  • mongod_audit: Allows administrators and users to track system activity for deployments with multiple users and applications. Mongod Audit logs capture events related to database operations such as insertions, updates, deletions, user authentication, etc., occurring within the mongod instances.
  • mongod_database: Collects a running log of events, including entries such as incoming connections, commands run, and issues encountered. Generally, database log messages are useful for diagnosing issues, monitoring your deployment, and tuning performance.
  • organization: Provides a detailed view of your organization's activities, enabling tracking and monitoring of significant actions and status changes involving database operations, billing, security, hosts, encryption, user access, and more, as performed by users and teams.
  • process: Collects host metrics per process for all the hosts in the specified group. Metrics like measurements for the host, such as CPU usage, number of I/O operations and memory usage are available in this data stream.
  • project: Collects events from MongoDB Atlas instance, providing a comprehensive record of actions and changes made within a project. These events can include modifications to database configurations, user access changes, and general project activity. It's a crucial resource for auditing and monitoring the activities within a MongoDB Atlas project.
Note

Users can monitor and see the logs and metrics inside the ingested documents for MongoDB Atlas in the logs-* index pattern from Discover.

Elastic Agent must be installed. For more details, check the Elastic Agent installation instructions. You can install only one Elastic Agent per host.

Elastic Agent is required to collect data from MongoDb Atlas and ship the data to Elastic, where the events will then be processed via the integration's ingest pipelines.

Agentless integrations allow you to collect data without having to manage Elastic Agent in your cloud. They make manual agent deployment unnecessary, so you can focus on your data instead of the agent that collects it. For more information, refer to Agentless integrations

Agentless deployments are only supported in Elastic Serverless and Elastic Cloud environments. This functionality is in beta and is subject to change. Beta features are not subject to the support SLA of official GA features.

You can store and search your data using Elasticsearch and visualize and manage it with Kibana. We recommend using our hosted Elasticsearch Service on Elastic Cloud or self-managing the Elastic Stack on your own hardware.

To collect data from MongoDB Atlas, the following parameters from your MongoDB Atlas instance are required

  • Public Key
  • Private Key
  • Group ID
  • Organization ID
  1. Generate programmatic API keys with Organization Owner permission by following the instructions in the Atlas documentation. Then, copy the public and private keys which function as a username and API key respectively.
  2. From the Atlas UI with project owner permission, go to Project Settings > Access Manager > API Keys and then click Invite To Project to add the API key created above, as described in the Atlas documentation.
  3. Add a specific role to API keys, under Project Settings > Access Manager > API Keys. This step is important to make sure that these API keys have the right permissions to access the data without running into any issues. The specific role for each data stream is defined under the data stream reference section.
  4. Enable Database Auditing for the Atlas project you want to monitor logs. Follow the instructions in the Atlas documentation.
  5. Find your Project ID (Group ID) in the Atlas UI. To do this, navigate to your project, click Settings, and copy the Project ID (Group ID). You can also programmatically find it using the Atlas Admin API or Atlas CLI as described in this Atlas documentation.
  6. On the Atlas UI, select your organization from the context dropdown, click Settings, and copy the Organization ID.
  • Granularity: Duration that specifies the interval at which Atlas reports the metrics.
  • Period: Duration over which Atlas reports the metrics.
Note

Both of the above attributes can be set by using a period in configuration parameters.

  1. In Kibana go to Management > Integrations.
  2. In the search bar, type MongoDB Atlas.
  3. Click the MongoDB Atlas integration from the search results.
  4. To add the integration, click the Add MongoDB Atlas button.
  5. Enter all the necessary configuration parameters, including Public Key, Private Key, and GroupId.
  6. Save the integration.

Notes:

  • The mongod_audit, mongod_database, organization, and project data streams gather historical data spanning the previous 30 minutes.
  • We recommend setting an interval of five minutes or higher for collecting mongod audit and database logs, as MongoDB Atlas refreshes logs from the cluster's backend infrastructure at five minutes intervals as described in this Atlas document.
  • The logs collection from MongoDB Atlas does not support M0 free clusters, M2/M5 shared clusters, or serverless instances.
  • Mongod is the primary daemon method for the MongoDB system. It helps in handling the data requests, managing the data access, performing background management operations, and other core database operations.

If you encounter an error while ingesting data, it might be due to the data collected over a long time span. Generating a response in such cases may take longer and might cause a request timeout if the HTTP Client Timeout parameter is set to a small duration. To avoid this error, it is recommended to adjust the HTTP Client Timeout and Interval parameters based on the duration of data collection.

{
  "error": {
    "message": "failed eval: net/http: request canceled (Client.Timeout or context cancellation while reading body)"
  }
}
		

The alert data stream collects alerts generated by the MongoDB Atlas. Alerts cover a wide range of metrics and events, such as resource utilization thresholds (CPU, memory, disk space), database operations, security issues, and configuration changes. To collect alert logs, the requesting API Key must have the Project Read Only role.

ECS Field Reference

Refer to ECS Field Reference for more details.

The mongod_audit data stream allows administrators and users to track system activity for deployments with multiple users and applications. To collect audit logs, the requesting API Key must have the Project Data Access Read Only or higher role.

ECS Field Reference

Refer to ECS Field Reference for more details.

The mongod_database data stream collects a running log of events, including entries such as incoming connections, commands run, monitoring deployment, tuning performance, and issues encountered. To collect database logs, the requesting API Key must have the Project Data Access Read Only or higher role.

ECS Field Reference

Refer to ECS Field Reference for more details.

The organization data stream collects detailed view of your organization's activities, enabling tracking and monitoring of significant actions and status changes involving database operations, billing, security, hosts, encryption, user access, and more, as performed by users and teams.

ECS Field Reference

Refer to ECS Field Reference for more details.

The project data stream collects events from MongoDB Atlas, providing a comprehensive record of actions and changes made within a project. These events can include modifications to database configurations, user access changes, and general project activity. It's a crucial resource for auditing and monitoring the activities within a MongoDB Atlas project. To collect project logs, the requesting API Key must have the Project Read Only role.

ECS Field Reference

Refer to ECS Field Reference for more details.

The disk data stream collects a detailed overview of disk usage and captures important data about I/O operations, read and write latency, and space utilization. To collect disk metrics, the API Key making the request must have the Project Read Only role.

ECS Field Reference

Refer to ECS Field Reference for more details.

The hardware data stream collects hardware and status metrics for each process in the specified group. It includes measurements such as CPU usage, memory consumption, JVM memory usage, disk usage, etc. To collect hardware metrics, the requesting API Key must have the Project Read Only or higher role.

ECS Field Reference

Refer to ECS Field Reference for more details.

The process data stream collects host metrics per process for all the hosts of the specified group. Metrics like measurements for the host, such as CPU usage, number of I/O operations and memory are available on this data stream. To collect process metrics, the requesting API Key must have the Project Read Only role.

ECS Field Reference

Refer to ECS Field Reference for more details.

This integration includes one or more Kibana dashboards that visualizes the data collected by the integration. The screenshots below illustrate how the ingested data is displayed.